Chapters in this title
Maine Uniform Building and Energy Code (MUBEC) Adopted
§ 15.04.010 — Adoption [City of AI, ME]
The Maine Uniform Building and Energy Code, including the International Building Code, International Residential Code, International Energy Conservation Code, and ASHRAE standards, is adopted by reference under 10 M.R.S. § 9722, with amendments as set in this chapter.
Dwelling Unit Tax (Capacity Charge)
§ 15.08.010 — Capacity charge [City of AI, ME]
New dwelling units pay a one-time capacity charge for water, sewer, and stormwater system capacity, as set in the city fee schedule.
School Facilities Land
§ 15.10.010 — Dedication [City of AI, ME]
Major subdivisions may dedicate land for school facilities under 30-A M.R.S. § 4404 in coordination with AI County RSU 220.
Transportation Uniform Mitigation Fee
§ 15.13.010 — Fee [City of AI, ME]
Major development projects pay a Transportation Uniform Mitigation Fee dedicated to multimodal transportation improvements identified in the Transportation Master Plan.
Flood Damage Prevention
§ 15.14.010 — Floodplain rules [City of AI, ME]
Development in mapped FEMA Special Flood Hazard Areas (Saltgrass Flats, Lantern Wharf, parts of Heron Bay) shall comply with the city's Floodplain Management Ordinance, with finished floors at least 2 feet above the base flood elevation.
Unsafe Buildings
§ 15.16.010 — Authority to declare unsafe [City of AI, ME]
The Director of Permit Central may declare a building unsafe after inspection and may order repair, vacation, or demolition consistent with due process.
Electrical Code
§ 15.20.010 — NEC adopted [City of AI, ME]
The current National Electrical Code as adopted by the State of Maine is adopted by reference.
Electrical Permits
§ 15.24.010 — Required [City of AI, ME]
Electrical work shall be performed by Maine-licensed electricians under a permit issued by Permit Central, except minor repairs under $200 that do not alter circuits.
Rental Housing Code
§ 15.44.010 — Registration and inspection [City of AI, ME]
All rental dwelling units in the City of AI shall be registered annually with Permit Central. Buildings of 4 or more units are inspected at least every 5 years; complaint-based inspection is available for any unit.
§ 15.44.020 — Habitability standards [City of AI, ME]
Rental units shall meet habitability standards including weather-tight walls, working heat, hot water, plumbing, electrical, smoke and CO detectors, pest control, and lead-paint compliance under 22 M.R.S. § 1320.
Mechanical Code
§ 15.48.010 — Adopted [City of AI, ME]
The IMC as adopted by Maine is adopted by reference.
Plumbing Code
§ 15.52.010 — Adopted [City of AI, ME]
The Maine Internal Plumbing Code is adopted by reference.
Residential Code
§ 15.54.010 — Adopted [City of AI, ME]
The IRC as adopted by Maine is adopted by reference.
Fire Code
§ 15.56.010 — NFPA 1 adopted [City of AI, ME]
NFPA 1 Fire Code, as adopted by the Maine Office of State Fire Marshal, is adopted by reference, with amendments as set in this chapter.
Green Building
§ 15.60.010 — Standards [City of AI, ME]
City-owned construction over 5,000 sq. ft. shall meet LEED Gold or equivalent. New residential construction of 5 units or more shall meet ENERGY STAR Multifamily New Construction.
Lot Grading
§ 15.64.010 — Permit [City of AI, ME]
Grading more than 50 cubic yards on a single lot, or grading on slopes greater than 15%, requires a grading permit.
Relocation of Structures
§ 15.68.010 — Permit [City of AI, ME]
Relocation of buildings on or through city streets requires a relocation permit, with route plan, utility coordination, and insurance.
Demolition of Structures
§ 15.70.010 — Permit [City of AI, ME]
Demolition of any structure requires a permit. Demolition of structures listed on the City of AI Historic Resources Inventory triggers a 60-day review by the Cultural Heritage Commission.
Regulations for Retrofitting
§ 15.72.010 — Seismic and resilience retrofits [City of AI, ME]
Voluntary seismic, weatherization, and coastal-flood retrofits are encouraged and may be expedited through the streamlined retrofit permit.
Affordable Housing in the City
§ 15.82.010 — Inclusionary requirement [City of AI, ME]
Multifamily residential projects of 10 or more units shall provide at least 12% of units affordable to households at or below 80% AMI, or pay an in-lieu fee.
Fire Hazard Severity Zones
§ 15.86.010 — Wildland-urban interface [City of AI, ME]
Properties mapped in fire hazard severity zones (parts of Granite Ridge and Mount Aviary) shall maintain defensible space and shall use ignition-resistant materials for new construction.
Post-Disaster Safety Assessment
§ 15.90.010 — ATC-20 assessments [City of AI, ME]
After a declared disaster, the Director of Permit Central shall coordinate ATC-20 rapid safety assessments and shall post placards on buildings (green/yellow/red).
Expedited Processing
§ 15.92.010 — Solar, EV, storage [City of AI, ME]
Permit applications for rooftop solar, EV charging, and residential energy storage are processed within 7 business days under streamlined review.